Read here

Steam Locomotive Construction and Maintenance

Ernest Leopold Ahrons · 1921 · Free in the US

26,052 words · about 1 h 49 min to read

Period artwork: Interior of the Bodleian Library, 1845
About this edition

Free in the US: this text is in the public domain in the United States; it may still be in copyright elsewhere.

Licence: PD-US · Wikisource licence template(s) on the work: {{pd/us}}. Text and transcription from en Wikisource by Wikisource contributors (transcription licensed CC BY-SA 4.0; contributors: https://en.wikisource.org/w/index.php?title=Steam_Locomotive_Construction_and_Maintenance&action=history). · Wikisource contributors

Text from Wikisource and set out for reading on screen; no words of the book are rewritten or summarized. How RedLectern is built

About this book

Author
Ernest Leopold Ahrons
Language
English
Published
1921
Length
26,052 words · about 1 h 49 min
Sections
13 reader sections
Text
Digital text
Rights
Public domain in the United States

 

Contents (13)

Continue:

Chapter I. General Considerations Affecting Methods of Construction

STEAM LOCOMOTIVE CONSTRUCTION AND MAINTENANCE

CHAPTER I

GENERAL CONSIDERATIONS AFFECTING METHODS OF CONSTRUCTION

A large volume would be required to deal fully with the manufacture of the many different parts of a locomotive and to describe the various processes in the foundries, smithy and forge, boiler-shop, machine shop, and erecting shops. Moreover the methods of construction of the various parts differ considerably in a small works, where perhaps only one or two engines are built at a time, from those in a large works, where from a dozen to fifty engines of the same class may be built to a single order. In the first case the methods and machines of an ordinary well equipped engineering shop would be used to a large extent, but in the second case there are employed special templates, “jigs,” fixtures, and above all, special machinery adapted for certain definite operations. The cost of such special machinery and appliances requires a large

Fig. 1.—Diagram Illustrating the Manufacture of Locomotive Engine and Tender.

capital outlay, which could not profitably be expended by a small works. It pays to make the necessary special time and labour-saving tools and appliances only when several similar engines are built together, or, as in many railway works, when much of the “motion work” and other parts of one class of engine are interchangeable with those of another class. Naturally when the conditions are such that a large number of similar engines can be constructed together with the help of special tools and “jigs,” the cost per locomotive is very considerably reduced. An isolated engine of a new design is necessarily expensive, but it generally pays a railway company to build such an engine, so that it can be tested thoroughly, and the necessary modifications and alterations made before placing a large order.

Progress of Work through the Workshops. A general idea of the order in which work passes through the various shops may be gained from Fig. 1, beginning with the raw materials. The latter term may and generally does include a considerable quantity of semi-finished material. Steel castings, axles, and tyres may be mentioned specially in this connection. One or two locomotive works, both of the railway companies and private firms, make their own steel castings, but generally these are purchased from outside manufacturers. The same applies to rough forged axles. Tyres are, in most cases, rolled at the mills of the steel makers who make a speciality of such work.

The diagram Fig. 1 explains itself, but there are considerable variations in the practice at different works. For instance, boiler mounting work is frequently done in an annexe of the boiler shop itself. Of general machine shops there are frequently two or even three, one or two being devoted to the large machines employed upon the heavier parts, and another to the smaller machines for small pieces and repetition work. The diagram does not show the route taken by every part which goes to form the locomotive. To do this would be impossible. For instance, the firebox of a locomotive boiler is stayed with a large number of screwed steel and copper stays. In the latest practice these are screwed in machines which are placed in a convenient bay in the boiler shop itself, but it is more often the case that they are made in one of the machine shops, from which they go to the boiler shop. There are frequently many such cross paths for various details, and to show these would make the diagram unnecessarily complicated. Certain materials coming from the manufacturers have also been omitted, such as the asbestos mattresses or magnesia blocks used for boiler covering, or lagging as it is termed. These are taken from the stores direct to the erecting shop, where the boiler is lagged during the later stages of the erection of the engines.

One department, not shown on the diagram, must be mentioned briefly. This is the template shop, in which thin sheets of metal are cut out to the finished shapes of the different parts of the boiler and engine details in accordance with the drawings. These templates are sent to the forge, boiler and machine shops, where they are laid upon the corresponding parts being manufactured, instead of marking off the latter to measurements by rule. Much time is saved by the use of the templates.

Stores and Costing Accounts All raw materials, or semi-manufactured parts such as steel castings, are received from the makers into the general stores. The works manager issues the necessary orders to the stores for such materials or articles, which are sent to the various shops in which they are required. The cost of these is debited to the particular order, say for ten locomotives, for which they are to be used, each order receiving an order number, against which everything is charged that is required for that particular lot of engines, until they are completed. The cost of labour is determined by means of daily time sheets, on which the number of hours taken by each workman is entered against the order on which he has been engaged. Finally an overall charge is added for general expenses which include rent, rates, taxes, management, unskilled labour, drawing office expenses, power, lighting and depreciation of plant. This charge usually takes the form of a fixed percentage either of the total cost of materials and skilled labour combined, or of the cost of skilled labour alone, generally the latter. The combined total gives the cost of the engines built to the particular order under consideration, which divided by the number of locomotives, gives the cost per engine.

Before the war the cost of an average mainline engine and tender, when say ten were constructed together, would vary roughly from about £2,500 to £3,700 at the works, according to the size of the engine, and the fluctuating prices of materials. Post-war conditions have caused these costs to be from 3½ to 4 times the above amounts.

Chapter II. Boiler Shop

CHAPTER II

BOILER SHOP

Boiler Plates and Making the Boiler Barrel. The steel plates are delivered into the boiler shop after they have been sheared to sizes about ½ in. larger all round than the finished sizes to which they are put together in the boiler. They must be of the very finest quality, since they have to undergo processes, such as flanging, punching, etc., which would inevitably crack or otherwise injure inferior material.

After their arrival, the plates are first straightened to remove any slight waviness, by passing them through a machine, sometimes known as a “mangle,” which has a number of hard steel rollers, usually four above and three below. By passing the plate through between the upper and lower rollers two or three times the irregularities are removed.

The length of the barrel of the boiler may vary from about 10 ft. to 16½ ft. in British engines. In boiler barrels up to about 12 ft. long, two plates are generally used instead of three plates as in former practice. For longer barrels three plates are usual, though two are sometimes used. Engines have recently been built for the Great Northern Railway, in which the barrel 11 ft. 5½ ins. long is made of a single plate. Such plates have the advantage of dispensing with a transverse riveted seam, and are consequently stronger, but large plates above certain commercial sizes are more expensive per ton weight.

The plates have to be joined together by riveted joints. Each plate is bent round to a true circle, and its edges which come together are covered with narrow plates both outside and inside the boiler. These narrow plates A A (Fig. 2) are called butt strips, and when fixed properly in place are riveted to the main plate to form a joint running longitudinally along the boiler. This forms one ring of the boiler barrel. The second ring is made similarly, and the two rings have then to be united by rivets to form the complete barrel. The latter joint is termed the transverse joint, and may be made from two rings of the same diameter, in which case a narrow weldless ring B must be riveted all round the circumference over this joint. More frequently, however, the front ring is made of smaller diameter than the back ring, just sufficient to allow it to enter telescopically inside the back ring for a short distance, the two then being riveted directly to each other.

The boiler illustrated in Fig. 2 differs from the one mentioned above in that it has three rings of the same diameter, which are united by single-riveted circular butt strips B, i.e., there is only one row of rivets on each side of the transverse joints. The longitudinal joints A where the ends of each ring are joined together have

Fig. 2.—Sections through Locomotive Boiler

double-riveted butt straps, i.e., there are two rows of rivets on each side of the joint.

Before the barrel rings are made and jointed, the straightened plates are marked off for the rivet holes. In British practice the holes are usually drilled, but in some works, and invariably in American practice, they are punched. Punching boiler plates is injurious to the metal immediately surrounding the holes, and therefore such holes are punched smaller than the finished sizes and afterwards enlarged by passing through them a tool in the form of a round drill with cutting edges, known as a “reamer.” This operation removes the damaged metal.

The exact position of each rivet-hole has to be marked off on each plate when punching is adopted, but when the holes are drilled five or six plates are taken at a time and only the top plate is marked off. The plates are then secured under a radial drilling machine (Fig. 3) and each hole marked on the top plate is drilled through all the plates by a single operation. The top plate is again used as a template or guide for drilling the holes in the next batch of plates.

The plates have also to be marked off at the edges all round so that they can be finished to the exact sizes. They may be done from the drawings in case only one or two boilers are being made, but when a large number are in hand the marking-off is usually done by template. The template is a sheet of metal cut out like a dressmaker’s pattern to the exact size of the

Fig. 3—Radial Drilling Machine for Boiler Plates. by Messrs. William Asquith, Ltd. (Halifax.)

plate, and in most cases it has also the rivet and other holes drilled through it to show their positions. Finally the edges of the plates are machined to size in a special plate-edge planing machine, in which a cutting tool moves along the edge for the full length or width of the plate.

| Fig. 4.—Diagram of Plate-Bending Rolls, in Cross Section.

The next operation is to bend the barrel plates into circular rings. This is done in another form of “mangle,” or plate-bending rolls. In this machine there are two bottom rolls (Fig. 4) which rotate in fixed bearings, and one top roll, the bearings of which can be moved up and down vertically. By gradually bringing the top roll down each time the plate is passed backwards and forwards through the rolls, a pressure is brought to bear on the plate, and by passing it through a sufficient number of times it is gradually bent to a true circle, except at the ends where the curvature is completed by pressing or hammering it into a block. This last operation is of great importance, and has to be done because it is impossible to finish the edges of the plates to a true circle in the rolls, and unless a true circular form be obtained, the boiler will strain at the joint, and give endless trouble in service.

Fig. 5.—Boiler Shell Drilling Machine. By Messrs. Campbells and Hunter, Ltd. (Leeds).

In many works the bulk of the rivet-holes are not drilled until the plates have been bent and put together, only a few holes being made through which bolts are passed to hold the plates together in place. The boiler is afterwards raised on end and secured on the revolving table of a boiler shell drilling machine (Fig. 5), and all the rivet-holes drilled through the plates in position. This produces holes which come accurately opposite each other.

Boiler Tube and Back Plates, Firebox Casing. The smokebox tubeplate shown at C on the left-hand side of Fig. 2, is a flat plate circular in shape except at the bottom, where there is a projection D to fasten it to the cylinders. Its edge is flanged out at right angles all round except along the base of the projection mentioned. The operation of flanging requires considerable skill and great care. It consists in heating the plate in a large furnace to a good red heat, and then sqeezing it between shaped cast iron blocks in a hydraulic press of the type shown in Fig. 6 capable of developing a total pressure of 300 to 400 tons. The table of the press slides up and down on four columns, being actuated by the plungers of the hydraulic rams seen underneath. Heavy cast iron blocks or dies in halves are machined to the shape of the finished plate and jointed together, the corners inside the flanges being rounded to the proper radii. The lower blocks are bolted to the bottom table of the press, and the upper

Fig. 6.—Hydraulic Flanging Press. By Messrs Fielding & Platt, Ltd. (Gloucester).

blocks to the cross-head at the top. The curves and shape of the blocks are so made that when they are pressed together, there is just sufficient space between them for the thickness of the plate. There are two sets of rams, the larger or main rams, and the smaller or vice rams. When the blocks or dies are fixed and the plate to be flanged has been placed in the proper position (in which it is held by steady pins which enter holes in the plate), the vice rams move the table up, and grip the plate firmly between the bottom and top blocks. Then the pressure is put on to the main rams, which squeeze the plate into the required shape between the dies. The whole operation is done at one heat. The firebox back plate is flanged in a similar manner, the dies in this instance being shaped so that the firehole is also pressed to the necessary form.

The “throat plate” E E (Fig. 2), which connects the firebox shell to the barrel of the boiler, is of a complicated shape, and has to be flanged in two opposite directions, since the upper portion has to have its semicircular flange turned forward to join the boiler barrel, and the bottom part is flanged backwards to connect to the firebox shell wrapper plate. This plate requires extreme care when flanging to prevent damage to the material.

The sides and top F of the firebox shell are frequently made in one piece called the wrapper plate, which requires no flanging. The top portion is usually circular, and forms a continuation of the boiler barrel. This circular portion is produced by means of the plate bending rolls.

Assembling the Boiler. The boiler barrel is attached to the smokebox tube-plate by means of a continuous weldless angle iron ring G (Fig. 2). This is faced and bored in a large lathe or on a boring mill to fit over the end of the circular barrel plate, on to which it is shrunk by being heated slightly so that it expands. When put into place it contracts and grips the barrel plate, to which it is riveted all round the circumference.

The foundation ring H at the bottom of the firebox (Fig. 2) is a steel casting or forging of rectangular shape, the sides of which must be perfectly “square,” as it has to fit accurately between the inner copper firebox and the firebox outer shell or casing. It is machined and ground to accurate dimensions, the rivet-holes marked off and drilled, and then it is fitted to the firebox shell.

The whole of the plates and parts are then put together, and temporarily held in place by bolts through some of the rivet-holes. The structure has to be levelled carefully, so that the different plates are “square” and in line with one another. Careful measurements are made to see that the parts come together in accordance with the drawings or templates, and straightedges are used to test the alignment and “squareness.” When this is correct the riveting is done, except the foundation ring, which cannot be riveted until the inner copper firebox is put into place.

Riveting in former years was done entirely by hand, three men and a boy being employed. The boy attended to the heating of the rivets in a suitable portable furnace. One man placed the white hot rivet in the hole, and then held up the head tightly against the plate with a heavy “dolly” tool, which acted as an anvil to take the force of the blows. The other two men on the opposite side then hammered down the protruding shank of the rivet, until a head was formed. In present day practice hydraulic riveting machines are used invariably. These are shaped after the manner of the pincer claws of a lobster, which grip the rivet from both sides of the plates and squeeze it up in the hole. Before any riveting is done it must be seen that the holes come fair and true with each other, and if the marking off has been done properly to template this is usually the case. Any holes which may not come quite true are drilled or reamered out to a slightly larger size, and larger rivets are used in them. Holes which have been originally drilled instead of punched are more accurate in respect to true alignment.

An important point in putting the boiler together is to see that the expansion brackets or angle irons K (Fig. 2), which support the boiler on the frames at the firebox end, are perfectly level, otherwise the boiler may bind on the frame, and not expand properly when hot.

Dome and Safety Valve Seating. The dome L (Fig. 2), is formed of a small plate bent into a ring, the joint being either riveted or welded. It is flanged at the bottom in a press by means of blocks made to suitable shape. The flanged portion fits on to the circular barrel plate of the boiler, in which a circular hole has been made, and is riveted to it. The dome cover is a dished plate which is pressed into shape between blocks in a press, or sometimes under a steam hammer. The cover is secured to the dome, which has a faced flange or angle iron ring for the purpose, studs with nuts being used so that the cover can be removed when required. The safety valve seating and cover M are made in a similar manner.

After the boiler has been riveted up, the seams or joints are caulked. This is a process for making the joints thoroughly steamtight and preventing leakage, and consists in burring up the edges of the plates with a tool in the form of a chisel with a broad blunt edge. Care must be taken not to use a thin or sharp edge on the chisel or the plates will be injured and their edges forced apart. Caulking which was formerly done by hand, is now done by pneumatic hammers.

Inside Firebox: and Stays. The inside firebox N (Fig. 2) is of copper plates. These are planed at the edges, and the rivet and stay holes are marked off and drilled in the same manner as in the steel plates of the boiler and firebox shell. The flanging, however, is done usually by hand, the plates being heated and hammered down over shaped blocks with wooden mallets. The firehole, the circumference of which has to be flanged outwards to join the doorplate of the firebox shell, is however dished in a hydraulic press. (In Fig. 2 the older form of firehole ring is used instead of the flanged construction.) The flanges are then cut level by placing the plates on the table of a large horizontal band saw, and setting them level for the saw to cut off the ragged edges and leave the flanges of the correct width.

The holes for the tubes in the copper firebox tubeplate, and also in the steel smokebox tubeplate, are marked off either by drawing them out in detail on the plates when an isolated engine is being made, or by marking their positions from a template when several engines are being built.

The firebox plates are fitted to the foundation ring, and are put together in a similar manner to those of the firebox shell. Rivets of very soft iron or steel are generally used for copper fireboxes, though copper rivets have been used in this country and are still used on some French railways. The riveting is done with a hydraulic riveter having a very long gap or jaws, but the pressure used on copper plates is considerably less than that used on the steel plates of the boiler. If the roof stays are of the girder or bar pattern (as at O, Fig. 2), they have to be marked off and fitted to the firebox before the latter is put into and secured to the steel firebox shell.

To put the copper firebox into place the boiler is lifted by a crane and turned upside down, so that it rests on its back supported on blocks with the bottom of the firebox casing upwards. The copper firebox is then lifted by the crane and gently lowered into the firebox casing. To accomplish this, the foundation ring, which has been placed temporarily in position, will have to be removed. The firebox has to be set by measurement and to the marked centre lines, so that it will occupy an exactly central position. When everything is correct, the firebox and the shell are riveted together through the replaced foundation ring with long rivets, and also at the firehole ring. The roof stay holes in both the firebox and the top of the shell, when direct roof stay bolts are used, are reamered out with long reamers, and the holes are tapped in position for the stay screw threads. The reamering and tapping of screw threads through the plates are done by means of pneumatic drilling machines. These are driven at high speed by compressed air, and are arranged to take drills, reamers, taps, etc., as required. It may here be mentioned that every modern boiler shop is equipped with a complete air-compressing plant, from which pipes are taken to every part of the shop. To a large number of points on these pipes, flexible tubes can be attached to serve pneumatic chipping and caulking hammers, portable drilling machines, etc., so that these tools can be used on any portion of a boiler, in whichever part of the shop it may be standing.

The holes for the short side stays are similarly reamered out and tapped.

The copper side stays are turned and screwed in automatic lathes. The threads have to be made very accurately, since it is essential that they should fit tightly into the “tapped” or screwed holes in the copper plates of the firebox and into the steel plates of the firebox shell. After having been screwed into position, either by hand or by a pneumatic machine, the ends of the stays are cut off to a definite length, which leaves a short length projecting on each side of the plates to be riveted over.

Tubes. The tubes are put in from the smokebox end, the holes in the front tubeplate being, for this purpose, made slightly larger than the outside diameter of the body of the tubes. The tubes themselves are enlarged at the smokebox end, and swaged down to a slightly smaller diameter at the other end where they pass into the firebox tubeplate. At the latter end the tubes project into the firebox for about ⅜ in. to allow for “beading over” the ends up against the copper tubeplate. They are tightened in the holes by means of a tube expander, a special tool provided with a number of rollers. This is placed inside the tubes, the metal of which is rolled outwards until they are a tight fit in the holes. In the case of steel tubes a ridge or beading is also rolled on the tube on the boiler side of the firebox tubeplate. Brass or copper tubes are expanded and secured by driving short pieces of steel tube (called ferrules) tightly into the ends which pass through the tubeplate. At the smokebox end the tubes are merely expanded, neither beading nor ferrules being used.

Mountings. The boiler is then sent to another part of the shop to have the “mountings” put on. This term includes all the brass and other fittings, such as safety valves, water and steam gauges, cocks, etc. In British practice the mountings are not screwed directly into the boiler plates. Steel “pads” or seatings of the same shape as the flanges of the mountings having been previously riveted to the boiler, the flanges are secured to these by studs. The joints are faced and scraped, and either made metal to metal with boiled linseed oil, or a thin sheet of asbestos slightly smeared with red lead is placed between the faces. The nuts are then tightened gradually to make an absolutely steam-tight joint.

Boiler Testing. The boiler before it leaves the shops undergoes two tests. The first is a hydraulic test up to a pressure from 25 to 50 per cent. higher than the pressure at which the boiler works in service. The safety valves are locked, the boiler filled up with water, and the necessary pressure obtained by forcing additional water

Fig. 7.—Completed Locomotive Boiler.

in by means of a pump, or by connecting the boiler by a flexible pipe to the hydraulic installation of the shop, suitable pressure valves being inserted in the main to avoid any excess of pressure which would strain the boiler. All leaks and defects have to be made good before the second or steam test is applied.

The steam test pressure is limited to 10 lb. per sq. in. in excess of the working pressure of the boiler, and if this test is passed the boiler is painted with a good coat of anti-corrosive paint to preserve the plates, and is then ready for sending over to the erecting shop to be placed on the engine. Fig. 7 shows a locomotive boiler in its finished condition.

Chapter III. Foundries

CHAPTER III

FOUNDRIES

The work produced in the iron and brass foundries of a locomotive works is similar to that done in most general engineering foundries, except perhaps that locomotive cylinders are somewhat more complicated than those of most stationary engines. The moulding and casting of metals is a separate trade in itself, of which only the briefest mention can be made here.

Iron and Steel Castings. The number of locomotive parts made of cast iron is now somewhat less than was formerly the case, steel castings now being used for many of the brackets, hornblocks and other details, on account of the greater strength and reliability of this material. Steel castings are, in fact, replacing many forgings as well. The art of manufacturing steel castings is a special one, and for this reason few locomotive works have their own steel foundries, and most of them find it easier and more economical to purchase steel castings from firms who have made a special study of the subject for years. Steel castings are used for wheel centres, motion plates, frame stays, horn blocks, driving axleboxes, dome seatings, bogie centres and various brackets and smaller parts.

Iron castings are used for cylinders, the drag-box under the footplate, the chimney, blast-pipe, and regulator-head in the dome, also for certain hornblocks, smaller axleboxes and brackets. Brake cylinders, brake blocks, firebars, sandboxes and on some railways the wheel coverings or “splashers” for goods engines are also of cast iron. This list includes castings of very varying types and qualities of cast iron. For instance, the cylinders are made of the very best close-grained iron of special quality and mixtures, and the greatest care is taken to produce a strong hard material free from any “honeycomb” or other defects, but at the same time the hardness must not be so excessive that they cannot be suitably machined and fitted.

At the other end of the list are the firebars, which are usually made of common scrap, much of which has had to be rejected as unsuitable for other foundry purposes.

It must not, however, be understood that scrap iron castings are inferior as a material. All the best castings such as cylinders contain a percentage of scrap iron varying from 15 to 50 per cent., but this scrap is best selected material, derived from old cylinders and best machine parts. The pig irons used are also selected with a view to the quality of the castings desired, and for cylinders it is usual to mix two different good grades of pig iron with a percentage of scrap. In a locomotive works where a large variation in the qualities of the different castings has to be made, the greatest skill on the part of the foundry foreman is required in selecting and grading his materials.

Moulding for General Castings. The various groups of castings require different methods of moulding. Many of the smaller pieces, of which a large quantity are required, are moulded by machine,- or “plate moulded.” In the latter case the patterns are of metal and cast or fixed on to a plate. If the shape of the article to be made allows of it, the whole pattern is placed on one side of the plate, but in many cases half the pattern is on one side, and the other half on the opposite side. The mould is then made in two portions, the second part being produced by turning the plate over. One of the main objects of plate moulding (apart from speed of output), is to save wooden patterns from being damaged by the constant knocking and shaking required to remove them from the sand. A large number of articles can be made from the metal patterns in plate moulding which are all of the same size without variation. Vacuum brake cylinders, which are very thin castings, are made in this way, and also many forms of smaller axleboxes, brake blocks, etc.

The opening of the book is shown; the full text loads in the reader.

Loading the full text…