Front matter
PIS
Return this bocfcfeiF^feefore the Latest Date stamped below.
AUti 3 n
Preface
Even a slight acquaintance with the duties and responsibilities of a Colliery Manager will lead to the conclusion that he had need be almost omniscient within his own province. Besides his responsibility for satisfactory results in the openingout and working of a colliery, under the ever-varying conditions of coal-mining enterprise, there rests upon him a heavy legal as well as moral responsibility which no true man would wish to shirk, and in the discharge of which he has to prepare for that which happens more often, perhaps, in his career than in that of most professional men — viz., the unexpected. It becomes him, therefore, to fit himself beforehand in every possible way for the discharge of his onerous duties. In so doing he will have to acquire the rudiments of Geology, Chemistry, and Electrical Engineering ; a good deal more than the rudiments of Mechanical Engineering, Surveying, and Plan-making ; and to make himself master of the mysteries comprised in the comprehensive terms Practical Mining and Ventilation. Further, he must be thoroughly versed in the obligations imposed upon him and his subordinates by the Acts of Parliament bearing on the subject of Coal Mining, and by the Special Rules in force in any given district.
The Author is well aware, after twenty years’ experience, that the best and indeed the only satisfactory preparation for the efficient discharge of the duties of the Colliery Manager is that which is to be gained in the laborious school of experience ; but he knows also that the wise use of a carefully prepared and comprehensive handbook — such as he ventures to believe the volume now in the reader’s hand will be found to be — would have been to him an incalculable boon in the earlier vfefars of his course, and hardly less so subsequently as a book
VI
PREFACE.
of reference and of practical guidance. No doubt excellent handbooks already exist, dealing with various branches of the subject ; but the Author’s aim has been in the following pages to prepare a work more complete in itself than any of its predecessors, and one comprising the most recent information as to the ever-progressing science and art of Coal Mining. In the use of the work by students, it is believed that the questions and answers given on the various subjects will be found specially helpful.
The Author gratefully acknowledges the assistance which has been given him in preparing this work for the press by his friends Mr. J. T. Robson, H. M.’s Inspector of Mines for South Wales, and the Rev. J. E. Flower, M.A., of Wandsworth ; and also the courtesy shown by the Council of the Mining Institute of Scotland in granting him permission to quote the result of their Commission of Mining Engineers, as given in their Transactions (vol. iii., pp. 51 to 124). Besides much valuable information which has been obtained from the Transactions of the North of England and South Wales Institutes of Mining Engineers, he has also received considerable assistance from the columns of the Practical Engineer and the Colliery Guardian , and from other sources, reference to which will be found in various pages of the work.
The greatest care has been taken to ensure accuracy in every respect, but if any mistake has escaped notice the Author will be thankful to have it pointed out to him.
The preparation of this handbook — which for several years has occupied such time as the writer has been able to give to it — has been to him a most congenial task ; and he ventures, in sending it forth, to express the hope that the work may be found as useful to the student, and to those engaged in the management of collieries, as the preparation of it has been pleasant and profitable to himself.
Pontypridd,
January , 1891.
Chapter I. Geology
PAGES
Stratified and Unstratified Rocks — Dip — Rise — Outcrop — Strike — Diversified arrangement of Rocks — Faults — Classification of the Rocks into Systems — Igneous Rocks — Description of the different systems of Stratified Rocks 1-8
Chapter II. Search For Coal
In untried Districts by the Application of Geological Knowledge — Search in both anUnknown and Proved Coalfield by Boring — The operation of Hand-boring by the use of Rigid Rods — Boring with the Diamond Drill — Application of the Result obtained by a Series of Bores — Search for Coal in South Staffordshire — Search for Coal in Kent . . . 9-23
Chapter III. Shaft-sinking
Forms of Shafts — Mode of keeping them truly Vertical during the Sinking — Circumstances calling for consideration in Selecting their Sites — The Tools and Appliances used in Sinking— Timbering as it proceeds — Walling — Tubbing — Machine Drills to Expedite Sinking— Piling through Quicksands — Sinking through Quicksands by hollow Cylinders of Cast-iron — Poetsch’s Freezing System of Sinking through Quicksands—
The Kind-Chaudron System of Sinking —Explosives used for Blasting in Sinking 24-39
Chapter IV. Fitting Up The Shaft And Surface Arrangements
Arrangement of Pit Bottom for Small and Large Trams — Shaft Gates — Conductors— Buntons — Keeps — Pit Cages — Safety Cages — Detaching Hooks — Pit Head-gear — Pulleys — Ropes — Capping Round and Flat Ropes— Observations for Users of Ropes — Tables of different qualities of Round and Flat Ropes and of Chains — Method of Splicing Ropes — Shaft Signals — Pit Stage — Tipplers — Screens and under Railways— Winding Engines — Conical and Spiral Drums — Steam-brake to prevent over-winding — Counterbalancing the Load in Shaft — Rule for Winding Engine — Calculations of sizes required under given Conditions — Questions and Answers on Steam and Steam-engines — Systems of Winding Coal up Shafts without using Drums 40-87 viii
CONTENTS.
CHAPTER V. SURFACE ARRANGEMENTS {continued)
STEAM BOILERS AND THEIR FITTINGS.
PAC
Ordinary forms of Colliery Boilers, “ Egg-ended ” Cornish and Lancashire — General Construction and Flue arrangements — Galloway Tubes for Cornish and Lancashire Boilers — Details of Construction — Riveting, Punching, and Drilling — Caulking — Welded Shell Joints — Attachments of Flat Ends — Expansion Joints for Internal Tubes — Relative Strengths of Different Riveted Joints — Diagonal Seams — Complete Shell Rings — Means of Strengthening Apertures cut in the Shell — Seating a Lancashire Boiler — Faulty Methods of Seating — Seating Blocks and Crown Tiles — Means of Preventing Radiation of Heat — Position on the surface in which to place Boilers — Boiler Fittings — Mechanical Stokers — Hydraulic Test — Steam-pipe Connection — Steam-pipe Expansion Joints — Heating the Feed- water before it enters the Boilers — Feed-pumps and Injectors — Chimneys and Chimney Flues — Galloway Breeches- Flued Boilers — Babcock and Wilcox Water- tube Boilers — Vertical Boilers — Safeguards against Explosions — Grooving, &c. — Necessity for Care in Tending Boilers — Water Impurities — Analysing and Purifying Feed- water by the Addition of Chemicals — The Hotchkiss Boiler-Cleaner — Seale’s Patent Water Purifier — Periodical Examination of Boilers by Experts — Causes of Explosion — Dangerous Practices when Cleaning Boilers — Warming Surface Buildings by Steam —Rules Relating to Boilers — Separators and Steam-traps— Feed- water heaters and Economisers — Warning Whistles, &c. 88-
Chapter VI. Timbering And Walling
The kind of Timber used at Collieries — Storing it Underground — Method of fixing Props and Lids — Temporary Props and Lids — “ Dog” for drawing Props — “ Sets ” of Timber and their fixing in Main Roadways — Timber for Collars — Sills under Props — Timbering for a bad Roof, where the Floor and Sides are good — Lagging — Timbering for a bad Roof and Side, the other Side and Floor being good — Timbering for a bad Roof and Sides, with a good Floor — Timbering for a bad Roof, Floor and Sides — Lagging of Trees and Brushwood— Sizes of Timbers and their distance apart — “Cogs” or “ Chocks ” — Methods of Timbering in France — Notching the Timber — Cast-iron Props — Wrought iron and steel supports — Storing the Timber on the surface — Creosoting as a means of preserving Timber from decay — Customs as to Setting and Drawing the Timber — Walling the Main Roads from the Shaft — Material used in Walling — Semicircular arched Roadway — Invert under Side Walls — “Horse-shoe” Arch — Elliptical Arch for Roadway — Process of building Arches —Necessity of removing all Timber, and tightly packing behind the walls of Arches — Packing the Top and Sides with Sand 144-
Chapter VII. Narrow Work And Methods Of Working
Shaft Pillars — Water-Levels — Cross-measure Drifts from Shafts sunk through inclined strata — Stone Drifts through faults — Longwall Method of Working — Post and Stall System — Different Arrangements of Single Road Stall Working — Double Road Stall Method and its Modifications — Method of Working and Timbering adopted at the following Collieries: — Celynen, Risca, and the Ocean — Wicket System of North Wales — The Bank System of South Yorkshire— Method of Working and Timbering adopted at the following Collieries : — Lundhill, Kiveton Park, Pligh Park, Wearmouth, Silks-
CONTENTS.
IX
PAGES
worth, Florence, Great Fenton, Cannock and Rugely, Pemberton, Clifton Hall, Pendlebury, Sovereign, Radstock, Kingswood, Allanshaw, Cowdenbeath — Working thin seams in Northern France and Belgium — Square-work Working of the Staffordshire thick coal Seam — Working the thick coal Seams of Poland, Upper Silesia, and Bohemia — Dealing with excessively thick Coal Seams by Longwall and Post and Stall — Questions and Answers bearing on the Subjects of the Chapter . . . 158-243
Chapter VIII. Underground Conveyance
Rails on Main and Minor Roads — Construction of Tubs — Inclination suitable for Main Levels and Self-acting Inclines — Arrangement of Rails and Friction Rollers on Inclines — Blocks at the Bank-head— Ramean’s Safety Catch for Inclined Planes— Mortier’s Safety Catch — Method of Fixing the Incline Drum — The “ Seizer” placed at the Foot of Inclined Planes — Accidents on Self-acting Inclines — Arrangement for Stopping Run-away Tubs down Inclines — Cut-chain Haulage on Inclines — Counterbalance Tram for Inclines — Different Systems of Engine Planes — Direct Haulage-Tail-rope— No. 1 Endless Rope — No. 2 Endless Rope — Endless Chain — Signals on Engine Planes — Size of Hauling Engines necessary — Compressed air as a Motive Power — Compound Hauling Engines — Determination of Gradient for Horse Road and Inclined Plane — Calculating the Friction of Tubs 244-276
Chapter IX. Drainage
Winding Water up Shafts — lifting and Forcing Pumps— Making Pipe Joints Watertight — Balance Bobs — The Windbore — Clack-piece — Fish-piece — The Working Barrel — Action of the Pumps — Water Speed in Pipes — Construction and Method of securing Pumps — Preserving Pipes from the Action of Mineral Water— Pump Rods: — Their Material ; Method of Joining ; Steadying ; Safety Catches — Attachment of Bucket to Spears — Hanging Clack and Bucket Doors — General Arrangement of Lifting and Forcing Sets of Pumps — Determination of Weight Necessary for Balance Bobs — Use and Action of the Air Vessel — Bunton and Plank Brattices to form compartment in Shaft for Pumps — Arrangement for a Sinking Set of Pumps — Sliding Suction for Sinking Set — Messrs. Thornewill and Warham’s Details of Pump Work — The “ Deane” Sinking Pumps — The Cornish Pumping Engine — The Cornish Double-beat Valve — Davey’s Differential Valve Gear for Cornish Engine — Davey’s Compound Differential Pumping Engine — Relative Advantages of placing Pumping Engines Above and Underground — Steam Pumps — The Compound Differential Engine as arranged Underground — The Worthington Pumping Engine — Compressed Air for Underground Pumping Engines — Hydraulic Pumps — Moore’s Hydraulic Mine Pump — Wire Rope Systems of Pumping — Electrical Pumping Plant at the Trafalgar Colliery — Syphons for Drainage of Underground Roadways — Memoranda — Powers of Engines forgiven work — The Pulsometer, its Action and Use — Pulsometer arrangement for Draining Underground Workings — Calculation of Contents of Water Barrels . 277-315
Chapter X. The Gases Met With In Mines : Ventilation
The Atmosphere — Specific Gravity — The Symbols of Gases — Atomic Weight — Oxygen — Nitrogen — Carbonic Acid, or Carbonic Anhydride — Carbonic Oxide — Sulphuretted Hydrogen or Hydrogen Sulphide — Proto-carburetted Hydrogen —
X content's.
PAGES
Blowers — Outbursts — Pressure of Firedamp in the Solid Coal — Effect of Earthquakes in Liberating Gas — Afterdamp — Explosions of Fire-damp — The Diffusion of Gases — Natural Ventilation — The Furnace — The Waterfall — The Steam Jet — The Struve Ventilator — Nixon’s Ventilator — The Fabry Ventilator —
The Lemielle Ventilator — Cook’s Ventilator — Root’s Ventilator — Guibal Fan — Waddle Fan — The Schiele Fan— The Capell Fan — The Medium Fan — Fan Arrangement for a Winding Shaft — Two Separate Engines to Drive Fan — Duplicate Fan and Engine — Ascentional Ventilation — Stoppings to Direct the Underground Air- currents — Advantages of Air-splitting — Regulators — Doors on Travelling Roads — Air-crossings — Brattice — Velocities of Air-currents in the Roads and Shafts — Relative Sizes of Downcast and Upcast Shafts — Anemometer and Measuring the Volumes of Air — Ther- - mometer — Barometer — Effect of Diminished Atmospheric Pressure in Seams yielding Firedamp — Barometric Rules — Water-gauge — Motive Column and Rule to ascertain it — Horse-power of Ventilation — Useful Effect of Ventilating Fans — Theoretical Quantities of Air displaced by Fans — Rules for Total Volumes of Air required at Collieries 316-356
Chapter XI. On The Friction Of Air In Mines
The Pressure necessary to overcome Friction — Rate of Increase or Decrease — Power necessary to produce Ventilation — Rate of Increase or Decrease — Best Form of Airway— Examples on Pressures and Powers of Different Shaped Airways — Questions and Answers on Ventilation .......... 357~395
Chapter XII. Surveying And Planning
General Use of Working Plans — Chaining Distances — Construction of the Spirit Level — Method of Taking Levels — Ordnance Bench Marks — The Adjustments of the Spirit Level — Forms of Levelling Book — Mr. Wells’s Hints on Levelling Operations — The Miner’s Dial — Davis’s Improved Pledley Dial — The Hoffman Joint — Method of Needle Surveying — Vernier or “Fast” Needle Surveying — Reducing Angles to an Original Base Line — Declination, Diurnal Fluctuation, and dip of the Needle — Construction of the Transit Theodolite — Method of Using the Theodolite Underground —
The Adjustments of the Theodolite — The Protractor and its Use — The Parallel Ruler and its Use — Scales — Survey Book — Paper for Colliery Plans — Meridional Lines on Plans — Separate Plan of each Seam’s Workings — Desirability of Placing Full Information on Colliery Plans— Plotting the Surveys — “ Tieing ” Surveys — Plotting Sections — Colouring Colliery Plans — Computation of Areas and Produce of Coal from them — Setting out Railway Curves — Making Geological Sections — Louis’s Improved Davis’s Clinometer — Practical Questions and Answers 396-443
Chapter XIII. Safety-lamps And Firedamp Detectors
The Davy Lamp — The Clanny — Morgan’s — Protector — Pieler — Gray’s- -Hepplewhite- Gray — Marsaut — Mueseler — Evan Thomas — Clifford — McKinless — Cryptograph Lock — Cuvelier’s Patent Lock — Examining and Testing Safety-Lamps before going into the Mine — Patterson’s Testing Apparatus— Primary and Secondary Portable Electric Safety-lamps — Garforth’s Firedamp Detector — Liveing’s Firedamp Detector — Maurice’s Firedamp Indicator 444~4^4
CONTENTS.
Xl
Chapter XIV. Sundry And Incidental Operations And Appliances
PAGES
Carbonic Acid Gas Detector — Coal Dust — Watering the Underground Roadways — Explosives and Blasting Operations — Gunpowder — Gun-cotton — Tonite — Nitro-glycerine — Dynamite — Bellite— Useful work performed by Explosives — Blown-out Shots — Johnson’s Tamping Plug — Charging, Stemming and Firing Shots — Experiments with Wooden Plugs for Tamping — The Water Cartridge and Accessories — Sand and other means of Protecting Cartridges — Tamping with Wet Moss — Roburite — Carbonite — Securite — Lime Cartridges — Wedges for Coal getting — Macdermott’s Rock and Coal Perforators — Ingersoll Hand-power Rock Drill — Ingersoll Machine-power Rock Drill — Gillott and Copley Rotary Coal-cutting Machine — Bower, Blackburn and Mori Electrical Coal-cutting Machine — Stanley’s Coal Heading Machine — Caging Appliances and Drop Staples — Pit Horses, their Food and Work — Fleuss Apparatus for Breathing in Noxious Gases — Fleuss Lamp — Exploring for Water — Underground Dams -Water-blasts — Underground Fires — Testing the Roof — Driving through Faults — Watt’s Steam Indicator — Richards’s Indicator — Use of Indicator Diagrams — Continuous Diagrams — The Thompson Indicator — Schaffer and Budenberg’s Double Indicator — Bourdon’s Pressure Gauge — Schaffer and Budenberg Bourdon Gauges —
Steel Tube Gauges for Very High Pressures — Duplex Gauges — Graduating Ordinary Pressure Gauges — Graduating Steel Tube Pressure Gauges — Bourdon Vacuum Gauges — Schaffer Diaphragm Gauge — Testing Vacuum Gauges — Lightning descending .Shafts — Dunford and Emen’s Patent Automatic Tub-greaser— Self-lubricating Pedestals for Colliery Tubs 465-529
Chapter XV. Miscellaneous Questions And Answers
Denudation — Meeting of Cages in a Shaft with Flat Winding Ropes — Outstroke and Wayleave — Pressure of Water against a Barrier — Applying the Result Obtained from Boring —Discharge of Water from a Bore-hole — Pressure per Square Inch Produced by an Air-Compressing Engine — Description of Anthracite, Semi-Bituminous, Bituminous, Cannel, and Lignite Coals — Dynamometer — Elements of Rocks — Relative Hardness of “ Rock Masses ” — Beds and Veins of Minerals — Difference of Vein, True Fissure Vein, and Lode 53°-540
Appendix
SUMMARY OF REPORT OF HER MAJESTY’S COMMISSIONERS ON ACCI- DENTS IN MINES 541-552
INDEX .
LIST OF ILLUSTRATIONS.
fig. i. Stratified and Unstratified Rocks page i
2. Horizontal and Inclined Strata .......... 2
3. Unconformable, Bent and Contorted Strata 2
4-9. Head-Gear and Windlass for Boring, Ordinary Bore-Rod, Chisel, Wimble,
Beche and Rounder ........... 10
10-14. Bracehead, Brake or Lever for Boring, Runner, Topit, Key . . . .11
15* Shoe-Nose Shell, with Valve, for bringing up loose stuff. Wrought-Iron screwed Well Bore Pipes. Auger for clay and stiff soil. V-Nose chisels for hard ground. Shell -auger with valve for loose and wet soil. Bell-shell, with Valve, for loose gravel. Lifting Dog for raising Rods. Pair of Rod- Wrenches for screwing and unscrewing Rods. Levers for turning Rods. Spring Dart for drawing Pipes in Bore-Holes. Bell-Box for bringing up broken bits.
Spiral Worm for extracting broken Rods. Worm Auger for loosening stuff in Bore-Holes. Square-Nose Chisel. S-Nose Chisel for Hard Strata. T-Nose Chisel for Hard Strata. Rods with Screw Joints in 5 and io-foot lengths . 12
16. Method of Boring with the Diamond Drill 14
17. Plan showing position of Bore- Holes 18
18-20. Spring Hook, Curbs or Cribs for Sinking . . . . . . 25
21-23. Ring-Crib. Combined Wedging and Ring Crib 28
24-25. Segment of Metal Tubbing .......... 29
26. Timber, Walling and Tubbing in a Sinking Shaft 31
27. Piling through Quicksands in a Sinking Shaft 32
28-29. Poetsch’s Sinking Process ........ 33~34
30. The Kind-Chaudron system of sinking Shafts ..... *35
31-33. Kind-Chaudron system — Large Trepan ........ 3^
34-37. Do. do. — Small Trepan 37
38. Double-Decked Cage 42
39. Treble-Decked Cage 43
40-41. Broadbent’s Safety Cage 44
43-46. Ormerod’s Safety Link 45
47. Arrangement of Catch-Plate in Headgear for Ormerod’s Safety Link . . . 46
48. Foster & Brindle’s Detaching Hook 47
50. Iron Pit-head Frame at the New Hall Park Collieries 49
51-53. Wire-Rope Capping 53
54. Repairing broken Wire Rope 5^
55-58. Rope Splicing 5^“59
59-60. Cone and Spiral Drums . . . . • • • • .61
61. Pair of High-Pressure Winding Engines • 63
62. Counterbalance Chain for Winding 65
63. Marcet’s Boiler 7°
64. Illustrating the action of a Winding Engine 7 8
65. Lancaster Piston Block 80
66-67. Lancaster Piston Rings and Spiral Spring 81
LIST OF ILLUSTRATIONS. xiii
fig. 68-69. Lancaster Piston Rings and Serpent Coil Spring page 82
70. Joy’s Valve Gear 83
71-72. Craven’s Winding Gear 85
73. Common Cylindrical Boilers .......... 89
74. Cornish Boiler 89
75. Lancashire Boiler with Galloway Tubes .... ... 90
76-79. Boiler Plate Joints 91
80-81. Zig-zag and Chain Riveting 92
82. Punched Holes 92
83-84. Split Caulking 93
85-86. Attachment of Front and Back End Plates 94
87. Bowling Hoop Expansion Joint . ......... 94
88. Adamson’s Flanged Seam 95
89. Paxman’s Flue Joint 95
96. Faultily Seated Cornish Boiler 98
98. Closing-in Tile . . .99
99-104. Improperly Seated Boilers 100
91-95. The Seating of an ordinary Lancashire Boiler 101-102
105. Front Elevation of Lancashire Boiler ......... 102
108. Hopkinson’s Double Safety Valve ......... 105
90. Longitudinal Section of a Lancashire Boiler . . . . 106
109. Side Elevation of a Lancashire Boiler 106
iio-iii. Steam Pipe Expansion Joints .......... 108
112-113. Undesirable methods of connecting Steam Pipes with Boilers .... 109
114-116. Approved methods of connecting Steam Pipes with Boilers . . . iio-iii
1 1 7. Means resorted to through neglecting to place the main steam pipe on a level
with the stop valves . . . . . . . . . . .111
1 18. Steam Pipe Expansion Joint for underground roadways . . . . . 112
1 19. The Giffard Injector 114
120-122. The Galloway Boiler 118-119
123. The Babcock and Wilcox Water-tube Boiler . . . . . . .122
124. The Hotchkiss Boiler-cleaner . . . . . . . . . . 127
125-128. Seale’s Patent Water-purifier . . . 129
129. Laminated Steel Boiler-plate . . . . . . . . ..131
130. Geneste and Hercher’s Self- acting Steam-trap 137
1 3 1. Tangye’s Self-acting Steam-trap and Separator . . . . . . . 137
132. Royle’s Automatic Return Steam-trap . . . . . . .138
I33~I34* Expandisc Steam-trap 139
I35~I38 and 141-144. Methods of Timbering Roadways 145
137. Dog for drawing Props . 145
157. Method of Securing a Roadway having a good Floor but a bad Roof and Sides,
by means of Side Walls and Semi-circular Arch 153
158. Method of Securing a Roadway by Walling with Upright Sides, over which is
turned a Semi-circular Arch and Underneath an “ Invert ” or Flat Segment Arch *154
159. Arching for Underground Roadway where the Sides and Roof form part of an
Ellipse, and the Floor an “ Invert ” or Flat Segment Arch . . . . 155
160. Section of Elliptically Arched Roadway, having One Foot of Sand interposed
between the Arching and Stratification, and showing a Double Line of Rails laid, and Gutter formed in it 156
XIV
LIST OF ILLUSTRATIONS.
FIG. 161. Section showing cross-measure drift driven from the Shaft to two Coal-seams page
162-163. Driving through a Fault 160
164. Plan showing Longwall Workings with Gob Roads advancing to the rise and
across the Cleavage ........... 161
165. Plan showing Longwall Workings with Gob Roads advancing Level Course and
across the Cleavage . . . . . . . . .163
166. Effect of “ Creep ” on the Roadways of a Mine .164
167. Post and Stall System of Working where the Levels are proceeding in the direc-
tion of the Cleavage 166
168. Post and Stall System of Working where the Levels are proceeding across the
Planes of Cleavage . . . . . . . . . 167
169. Plan showing usual arrangement of Single Road Stall System of Working Coal
in South Wales 169
170. Arrangement of the Single Road Stall System of Working Coal in South Wales
where the Roof is very good . . . . . . . . 1 7 1
1 7 1. Plan showing the Double Stall System of Working Coal in South Wales . . 172
172. Section of the Black Vein at Celynen Colliery, showing also the Mode of
Securing the Face of a Double Stall Working by Cogs and Props . 1 73
173. Celynen Colliery, South Wales. Double Stall Method of Working . . . 174
174. Arrangement of the Broken in the Double Stall Workings on the Black Vein at
Celynen Colliery . . . . . . . . . 175
175. Section of the Black Vein at Risca Colliery 1 77
176. Risca Colliery, near Newport, Monmouthshire. Plan showing Longwall
Method of Working the Black Vein . . . . . . . . 178
177. Cwmpark Pit, Ocean Collieries, Treorky, South Wales. Section of Four Feet
Steam Coal 179
178. Ocean Colliery, Treorky, South Wales. Plan showing Longwall Method of
Working the Steam Coal Seams . . . . . • • . . 180
179. Plan showing the Wicket System of Working Coal in North Wales . . . 182
180. Plan showing the Bank System of Working the Barnsley Seam in operation at
the Lundhill Colliery, Yorkshire, in 1857 185
181. Lundhill Colliery, near Barnsley. Mode of Spragging and Propping in the
Pillar Workings of the Barnsley Seam 186
182. Lundhill Colliery, near Barnsley. Plan showing Bord and Pillar System in
operation for Working the Barnsley Seam . . . . . 187
183-184. Lundhill Colliery. Working in the solid places of the Barnsley Seam . . 188
185. Lundhill Colliery, near Barnsley. Mode of Working off Pillars in the
186. Kiveton Park Colliery. Double Fork for Endless Rope Haulage . . .190
187. Kiveton Park Colliery, near Sheffield. Sprags and “Cockermegs” in the
188. Kiveton Park Colliery, near Sheffield. Plan showing Longwall Method of
Working the Barnsley Seam . . . . . . . . .192
189. High Park Colliery, Langley Mills, Notts. Mode of Propping and Spragging
Coal in the Top Hard Coal Seam 1 93
190. High Park Colliery, Langley Mills, Notts. Plan showing Longwall Workings
in the Top Hard Coal Seam 194
191. High Park Colliery, Langley Mills, Notts. Plan showing Part of two Stalls,
with the Packwalls, in the Top Hard Coal Seam 195
192-193. Methods of Timbering in the Maudlin Seam, Wearmouth Colliery, Sunderland 196
194. Silksworth Colliery, near Sunderland, South Durham. Plan showing the usual
Method of Pillar Working in the Maudlin Seam 198
195. Silksworth Colliery, near Sunderland, South Durham. Plan showing Pillar
Working under a good roof in the Maudlin Seam 199
196. Silksworth Colliery, near Sunderland, South Durham. Plan showing a possible
arrangement of Pillar Working from one side of the Splits in the Maudlin Seam 201
197. Florence Colliery, Longton, North Staffordshire. Mode of Propping and Sprag'
ging at the Working Face on the Great Row Seam
LIST OF ILLUSTRATIONS.
XV
200-202.
206. 207. 208.
21 1.
219-220.
232. 233
Florence Colliery, Longton, North Staffordshire. Plan showing Longwall page Method of Working the Great Row Seam ....... 203
Florence Colliery, Longton, North Staffordshire. Plan of Longwall Face with the Gate-road and Packwalls connected with it in the Great Row Seam . 204
Methods of Repairing the Timber at Florence Colliery 205
Great Fenton Collieries, Stoke-upon-Trent. Cockersprag, Sprag> Props, and
Chocks at a Working Face in the Great Row Seam 206
Great Fenton Collieries, Stoke-upon-Trent. Plan of Longwall Face in the Great Row Coal Seam, showing Props and Chocks ..... 207
Cannock wood Collieries, Hednesford, South Staffordshire. Section of Deep Seam, and Mode of Propping and Spragging in a working Face . . . 208
Plan showing Longwall Method of Working the Deep Coal Seam at the Cannockwood Collieries, Hednesford ........ 209
Cannockwood Collieries, South Staffordshire. Plan showing Longwall Face in the Deep Coal Seam, and the Stalls, Packs, and Props connected with it . . 210
Pemberton Colliery, near Wigan, Lancashire. Method of Timbering a Working Place in the Orrell Five Feet Seam .212
Pemberton Colliery, near Wigan, Lancashire. Plan showing Longwall Method
of Working the Orrell Five Feet Coal Seam
Pemberton Colliery, near Wigan, Lancashire. Plan showing Longwall Face in the Orrell Five Feet Seam, with Packs, Chocks, and Roadway along Face Clifton Hall Colliery, near Manchester. Section of Doe Coal Seam, and Timbering in it .
Clifton Hall Colliery, near Manchester.
Clifton Hall Colliery, near Manchester.
Clifton Hall Colliery, near Manchester.
Clifton Hall Colliery, near Manchester.
Five Quarters Coal Seam Clifton Hall Colliery, near Manchester.
Clifton Hall Colliery, near Manchester.
same time in the Trencherbone Coal Seam
Method of Working the Doe Seam .
Plan of Lift on the Doe Coal Seam .
Section of Five Quarters Coal Seam .
Plan showing Method of Working the
Section of Trencherbone Coal Seam .
Plan of Three Lifts Advancing at the
Pendlebury Colliery, near Manchester. Section of Ram’s Mine Coal Seam and Timbering in it . . . . . . . . . . . . 222
Pendlebury Colliery, near Manchester. Method of Securing Roof by Double-headed Rails ............ 222
Pendlebury Colliery, near Manchester. Plan showing the Face of Level in the Ram’s Mine ............ 222
Sovereign Pit, West Leigh, near Manchester. West Leigh Five Feet .Seam, showing Props and Sprags used there ........ 224
Sovereign Pit, West Leigh, near Manchester. Plan showing the Method of Working the West Leigh Five Feet Seam ....... 225
Longwall Method of Coal Working in the Upper Series of the Somersetshire
Coalfield at Radstock 227
Longwall Method of Working the Great Vein of the Lower Series in the Somersetshire Coalfield at Kingswood, Bristol ....... 229
Allanshaw Colliery, Hamilton, Scotland. Section of the Ell Coal Seam . . 230
Allanshaw Colliery, Hamilton, Scotland. Plan showing Pillar and Stall Method
of Working the Ell Coal Seam 231
Cowdenbeath Collieries, Scotland. Section of the Dunfermline Splint Coal Seam .............. 232
Cowdenbeath Collieries, East Scotland. Plan showing Longwall Working of
the Dunfermline Splint Coal Seam 233
Cowdenbeath Collieries, East Scotland. Plan showing Face of Longwall Working in the Dunfermline Splint Coal Seam 233
No. 1 Mode of Working Thin Coal Seams in Northern France and Belgium, adopted where the Inclination does not exceed Thirty Degrees . . . 234
No. 2 Method of Working Thin Coal Seams in Northern France and Belgium, adopted where the Inclination ranges from Thirty to Sixty Degrees . . . 235
No. 3 Method of Working Thin Coal Seams in Northern France and Belgium, adopted where the Inclination varies from Sixty to Ninety Degrees . . 235
The opening of the book is shown; the full text loads in the reader.
Loading the full text…
The end
You’ve reached the end of The colliery manager's handbook; a comprehensive treatise on the laying-out and working of collieries, designed as a book of reference for colliery managers and for the use of coal-mining students preparing for first-class certificates.
